Real Estate

Confirmed: Wynn Al Marjan Island Opens September 2027, UAE’s First Casino Resort

Confirmed: Wynn Resorts will open Wynn Al Marjan Island in September 2027, with the construction budget rising to around $5.7 billion.

Update! Wynn Resorts Ras Al Khaimah: Opening of first Casino Mega Resort

Wynn Al Marjan Island is the UAE’s first integrated casino resort, a $5.7 billion project rising on Al Marjan Island in Ras Al Khaimah. When it opens in September 2027 it will be Wynn’s first beachfront property anywhere in the world, the first Wynn in the Middle East and the only licensed commercial gaming venue in the Emirates.

UPDATE, 5 August 2026: Wynn Resorts has confirmed September 2027 as the opening month, replacing the Spring 2027 target that had stood since 2024. The construction budget has also risen by around $600 million to approximately $5.7 billion. Everything below reflects the revised timeline.

This is the article we keep updating as the project moves forward. Bookmark it. Last updated 23 October 2026 with new construction photos, the Wynn Marina reveal, a correction to the resort’s leadership, the Royal Apartments, the Mayfair and Paris names, the confirmed opening date, the revised budget, construction milestones, leadership, gaming licence updates and the full set of guides we have published on the resort.

Quick snapshot:

  • Opening: September 2027 (confirmed August 2026)
  • Investment: $5.7 billion (AED 20.9 billion)
  • Height: 352 metres, 70 storeys, the tallest structure in RAK
  • Total keys: 1,540 (1,217 Resort + 323 Enclave)
  • Marina: Wynn Marina, 98 berths, yachts up to 85 metres, run by IGY Marinas
  • Convention center: 7,708 sqm
  • Pools: 12 pools
  • Shopping parterre: 12,000 sqm
  • Dining: 22 restaurants, bars and lounges
  • Casino: 225,000 sq ft gaming floor, UAE’s first commercial gaming licence
  • Jobs: 2,750+ hires in 2026, 4,000+ long-term roles
  • Location: Al Marjan Island, Ras Al Khaimah, 45 minutes from Dubai

Latest News

October 2026: Wynn Marina Revealed and New Construction Photos

On 5 October 2026 Wynn revealed Wynn Marina, the resort’s 98-berth superyacht marina, built around a circular harbour that will be in view from the rooms, terraces and restaurants that surround it. It takes super and megayachts of up to 85 metres, which Wynn says is more yachts and bigger boats than any other hotel-attached marina in the UAE. Fort Lauderdale’s IGY Marinas will run it, Marina Solutions International designed the basin and a central building called the Capitainerie, designed by Dewan Architects + Engineers, will handle arrivals, concierge and crew services, so yacht guests can check in without stepping off the boat. Max Tappeiner, President of Wynn Al Marjan Island, said the marina will serve as a direct extension of the resort, and the Khaleej Times report on the Wynn Marina announcement has the full detail. The Marina and Ocean Estates sit around the harbour: what we know about them is in our Wynn Enclave guide, including the Marina and Ocean Estates. For a look at how far the build has come, Gulf Business photographed the site from the water on 22 October 2026, showing the bronze façade on the tower and the lower-rise resort buildings taking shape along the shoreline: see the latest Wynn Al Marjan Island construction photos.

September 2026: Royal Apartments Named

On 14 September 2026 Wynn named the two Royal Apartments on the top two floors of the Resort Tower: the Mayfair Apartment and the Paris Apartment, each around 1,460 square metres with seven bedrooms. Where they sit in the wider room count and what is still to be revealed are in our full Enclave guide.

August 2026: Enclave Townhomes Revealed

On 25 August 2026 Wynn released the full specification for the Enclave Townhomes: four two-level residences of 630 to 1,110 square metres, the largest guest accommodations Wynn has built anywhere in its global portfolio. The same release revised the Enclave count to 323 accommodations and named a new category, the Ocean Estates. Full spec, the eight new renders and what is still to be revealed are in our Wynn Enclave and Townhomes guide.

August 2026: Wynn Beach Revealed

Wynn has completed its 550-metre shoreline, revealing Wynn Beach: three separate beaches (Resort, Adult and Enclave), a sheltered lagoon and a purpose-built offshore reef, ahead of the September 2027 opening.

September 2027 Opening Confirmed

Wynn Resorts has finally put a month on it. Wynn Al Marjan Island will open its doors to guests in September 2027, CEO Craig Billings confirmed on 5 August 2026 during the company’s second-quarter earnings call. It is the first firm opening window Wynn has given, replacing the Spring 2027 target that had stood since 2024.

The same call carried a second headline. The construction budget has risen by around $600 million to approximately $5.7 billion (AED 20.9 billion), up from the $5.1 billion figure quoted through 2025 and most of 2026.

Billings tied both the delay and the cost increase to regional conflict in the Middle East. The disruption hit global supply chains and, critically, the shipping insurance market, forcing Wynn to source some materials and equipment from alternative suppliers and reroute others.

Construction itself is moving quickly. Teams are now working through the interior fit-out of the hotel rooms, with mechanical, electrical and finishing work running in sequence. Wynn Resorts contributed $48.1 million (AED 177 million) to the joint venture during the second quarter of 2026, taking its total cash contribution to $1.06 billion (AED 3.9 billion). Wynn holds 40 per cent of the venture alongside Marjan and RAK Hospitality Holding.

Asked about geopolitical risk, Billings told investors Wynn remains fully committed to the UAE, pointing to the country’s resilience through recent months and noting that the project was never underwritten on an assumption of zero regional risk.

WOW-RAK Expert Tip: A September opening is better news for RAK than the spring date it replaces. The emirate’s hotel season runs from roughly October through April, so Wynn now opens straight into a full peak season rather than into the summer lull.

The mega-resort is expected to play a major role in Ras Al Khaimah’s tourism ambitions as the emirate targets 3.5 million annual visitors by 2030.

The Resort in One Paragraph

Wynn Al Marjan Island is a 60-hectare beachfront resort with a private beach along a 550-metre shoreline, 12 swimming pools, a 98-berth superyacht marina, a theatre, event spaces, a luxury retail village and a 225,000 square foot gaming floor. Every number on that list is the largest of its kind currently under construction in the UAE. It is also the only Wynn property in the brand’s portfolio sitting directly on a beach, even the flagship Wynn Las Vegas is landlocked.

Wynn Al Marjan Island Tops Out, Redefining Ras Al Khaimah's Skyline

Wynn Al Marjan Island At a Glance

At a glance
Location
Al Marjan Island, Ras Al Khaimah, UAE
Opening target
September 2027 (confirmed by Wynn Resorts, August 2026)
Total keys
1,540 (1,217 Resort + 323 Enclave)
Casino
UAE’s first licensed casino under GCGRA
Restaurants and bars
22 venues
Jobs created
7,000+ at peak operations
Distance from Dubai
Approx 45 minutes via the new Wynn Bridge
Operator
Wynn Resorts (Las Vegas), 40% of the joint venture
Project cost
USD 5.7 billion (AED 20.9 billion)
Regulator
General Commercial Gaming Regulatory Authority (GCGRA)

Construction Timeline and Milestones

Construction broke ground in 2022. The resort topped out in December 2025 at 283 metres of structural concrete across 70 storeys, 27 months after foundation works began.

Key construction numbers so far:

  • 439,000 cubic metres of concrete poured
  • 20,744 façade panels installed, 79% complete
  • 99% low-rise structural completion
  • 1,504 rooms structurally complete
  • 18,000+ construction jobs created to date

The final spire installation is scheduled for later in 2026, taking the building to its full 352-metre height. Interior fit-out of the guest rooms is now the critical path, with mechanical, electrical and finishing work running in sequence alongside the restaurants and the casino floor. Wynn has confirmed September 2027 as the guest-welcome target.

WOW-RAK Expert Tip: The tower overtakes RAK’s current tallest building by more than 100 metres. If you drive along Sheikh Mohammed bin Salem Road today you can already see the structure from the E311, it is impossible to miss and will redefine the RAK skyline.

The Accommodation Breakdown: 1,540 Keys

The 1,540-key inventory splits cleanly into two distinct products.

Resort accommodations, 1,217 keys

These are the main tower rooms and suites, running from entry-level Resort King rooms up to panoramic Gulf-view suites. This is where most guests will stay and it is what the pricing guide on WOW-RAK covers in detail.

Enclave accommodations, 323 keys

The Enclave is a separate ultra-luxury product within the resort, Wynn’s answer to the “hotel within a hotel” concept that rooms guests alongside the highest-spending casino players. It includes:

  • 2 Royal Apartments, now referred to by Wynn simply as the Apartments
  • 4 Townhomes, 630 to 1,110 sq m over two levels
  • 10 Marina Estates, now grouped with the Ocean Estates
  • 297 Enclave Suites

Wynn raised the Enclave figure from 313 to 323 in August 2026 and has not published a new per-category breakdown. We have a full guide to the Enclave and its Townhomes and another to room types and estimated pricing on WOW-RAK.

Dining, Lifestyle and Entertainment

Wynn has confirmed 22 restaurants, bars and lounges on the property, the largest F&B programme of any resort currently under construction in the UAE. Three venues have been named publicly so far:

  • An Alain Ducasse steakhouse: the Michelin-stacked French chef’s first Middle East beachfront property
  • Delilah: the Wynn Las Vegas supper club, making its international debut
  • A signature Lebanese restaurant

The remaining 19 concepts will be revealed closer to opening. The property will also host international culinary events through Wynn’s partnership with Netflix’s Chef’s Table series, starting with a flagship three-day event in September 2026.

For the full dining line-up as it stands today, see the WOW-RAK Wynn restaurants guide.

Wynn Al Marjan Island Tops Out, Redefining Ras Al Khaimah's Skyline

The Casino and UAE Gaming Regulations

Wynn Al Marjan Island will operate the first legal commercial casino in the UAE. Wynn Resorts received the country’s first commercial gaming operator licence from the General Commercial Gaming Regulatory Authority (GCGRA) on October 4, 2024, a moment that changed the direction of UAE tourism overnight.

The gaming floor covers 225,000 square feet, making it larger than the gaming floor at Wynn Las Vegas. CEO Craig Billings has publicly said the sizing is deliberate: “You don’t want to underbuild the casino in a market where you will be the sole operator for a time.”

How the UAE legalised gaming

The UAE removed gambling from the federal Civil Transactions Law in 2024, creating the legal space for the GCGRA to issue commercial gaming licences. The regulator oversees casinos, online gaming and lotteries across all seven emirates. Wynn remains the only licensed land-based casino operator. For the full explainer on how the GCGRA works, which games are permitted, age limits and what happens if you use unlicensed sites, see the WOW-RAK UAE gaming regulations guide.

The market opportunity

Industry analysts project Wynn Al Marjan Island will position the UAE as the fourth major gaming market in the world behind Macau, Las Vegas and Singapore. The property sits within an 8-hour flight radius of 96% of the world’s population, a catchment unmatched by any other major integrated resort on earth. For context, Macau’s catchment within the same flight radius is roughly 70%.

WOW-RAK Expert Tip: The gaming floor will be physically separated from family and dining areas of the resort. Guests who never want to see a slot machine will not have to. Wynn has explicitly designed for the UAE cultural context.

Leadership Team

Wynn has assembled an experienced team to run the property.

Craig Billings is CEO of Wynn Resorts worldwide and has been the driving force behind the RAK project since its announcement.

Max Tappeiner has been President of Wynn Al Marjan Island since 1 September 2024, taking the property through its final construction years and into opening. He moved across from Wynn Las Vegas, where he was Executive Vice President of Operations, after senior roles at Resorts World Las Vegas, The Venetian and Palazzo, Mandarin Oriental and Kempinski.

Thomas Schoen, a Marriott and Starwood veteran, was the project’s first President from 2023 until Tappeiner took over.

Jobs and Economic Impact

Wynn is hiring 2,750 people in 2026 alone across gaming, food and beverage, hospitality, housekeeping, security, facilities and corporate functions. Long-term employment will exceed 4,000 roles once the resort is fully operational.

Wynn also built Wynn Oasis, a dedicated luxury residential community for resort employees with accommodation, dining, retail, fitness and community amenities. It is one of the largest employee housing investments in UAE hospitality history.

Application portals, priority hiring windows and the breakdown of 2026 roles are covered in the WOW-RAK Wynn jobs guide.

A WOW-RAK reader survey of 500+ RAK residents found 56% believe the project will substantially boost tourism revenue and employment, 60% expect notable increases in local real estate prices, 34% expressed concerns about social impacts like gambling addiction and 28% prioritised preserving local cultural integrity. The data reflects a community that is broadly positive but watching carefully.

The Wynn Bridge and RAK Infrastructure

Wynn is not just building a resort, it is rewiring how people reach Al Marjan Island. The 548-metre Wynn Bridge, due late 2026, will connect the island directly to the E311 and E611 highways via the new Wynn Boulevard. Travel time from Dubai drops to roughly 45 minutes.

RAK has paralleled this with major public infrastructure works: Sheikh Mohammed bin Salem Road expansion, E311 widening, a new VVIP terminal and private jet hangar at RAK International Airport targeted for Q1 2027 and 6,000+ trees planted along Wynn Boulevard as part of the landscape programme.

For the full bridge explainer (construction progress, public access, what it means for existing roads), see the WOW-RAK Wynn Bridge guide.

Casino Operator Wynn Plans UAE Resort With Gaming Facilities

Location: Al Marjan Island

Al Marjan Island is a cluster of four coral-shaped artificial islands off RAK’s southwestern coast, 45 minutes from Dubai International Airport and 15 minutes from RAK International. It is already RAK’s highest-profile waterfront destination and home to resorts including Rixos, DoubleTree, Accor and the upcoming JW Marriott Marquis.

Wynn sits on a dedicated parcel with 420 metres of private beachfront and its own 98-berth marina, Wynn Marina. For the broader Al Marjan Island story (beaches, hotels, restaurants, things to do and how to get there), see the WOW-RAK Al Marjan Island complete guide.

About Wynn Resorts

Wynn Resorts is an S&P 500 company founded by Steve Wynn and now led by CEO Craig Billings. It operates Wynn Las Vegas and Encore at Wynn Las Vegas, Wynn Macau and Wynn Palace in Cotai, and Encore Boston Harbor. The group has consistently won more Forbes Five-Star awards than any other hotel or casino company in the world.

Wynn Al Marjan Island will be the group’s fifth integrated resort globally and its first outside the United States and China. Wynn holds a 40 per cent equity interest in the joint venture developing it, alongside Marjan and RAK Hospitality Holding.

How Wynn Al Marjan Island Compares

For a side-by-side comparison with Atlantis The Royal, One&Only One Za’abeel, Bulgari Dubai and other top UAE luxury resorts (where Wynn wins, where the competition wins and what the verdict looks like today), see the WOW-RAK Wynn vs UAE luxury resorts guide.

Frequently Asked Questions

1. When will Wynn Al Marjan Island open?

September 2027. Wynn Resorts confirmed the month on 5 August 2026 during its second-quarter earnings call. It is the first time the company has given a specific month rather than a season, replacing the earlier Spring 2027 target.

2. Why was the Wynn Al Marjan Island opening delayed?

Regional conflict in the Middle East disrupted global supply chains and the shipping insurance market. Wynn had to source some materials and equipment from alternative suppliers and reroute others, which pushed both the timeline and the cost. CEO Craig Billings said the company remains fully committed to the UAE.

3. Is Wynn Al Marjan Island really the UAE’s first casino?

Yes. Wynn Resorts received the UAE’s first commercial gaming operator licence from the GCGRA on October 4, 2024. Wynn will be the only licensed land-based casino in the country when it opens.

4. How big is the casino?

225,000 square feet, larger than Wynn Las Vegas. It will be the largest integrated gaming floor in the Middle East.

5. How many rooms does Wynn Al Marjan Island have?

1,540 total keys split across 1,217 resort rooms and suites and 323 ultra-luxury Enclave accommodations including 2 Royal Apartments, 4 Townhomes of 630-1,110 sq m and the Marina and Ocean Estates.

6. How much does it cost to build?

Approximately $5.7 billion (AED 20.9 billion), after a $600 million increase confirmed in August 2026. The project was previously costed at $5.1 billion. Wynn Resorts holds 40 per cent of the joint venture and had contributed $1.06 billion in cash by the end of June 2026.

7. Can I book a room at Wynn Al Marjan Island yet?

No. Reservations have not opened and Wynn has not announced when they will. With a September 2027 opening, bookings would typically go live once the date falls inside a standard 12-month booking window.

8. How far is Wynn from Dubai?

Roughly 45 minutes by car once the Wynn Bridge opens in late 2026. Today it is about an hour depending on traffic.

9. Who runs Wynn Al Marjan Island?

Craig Billings is CEO of Wynn Resorts globally. Max Tappeiner has been President of Wynn Al Marjan Island since September 2024.

10. Can UAE residents gamble at the casino?

Yes, subject to GCGRA rules on age, identification and responsible gaming. Full details are in the UAE gaming regulations guide.

11. Will there be family-friendly areas separate from the casino?

Yes. The casino is physically separated from family, beach and dining zones. Guests can experience the full resort without entering the gaming floor.

12. How many jobs will the resort create?

2,750+ in 2026 and 4,000+ long-term roles across gaming, food and beverage, hospitality and corporate functions.

Sum Up

Wynn Al Marjan Island is the single largest tourism project in the UAE’s pipeline and the most consequential hospitality development in RAK’s history. With September 2027 now confirmed, the countdown is real: every remaining milestone (the spire, the bridge opening, restaurant announcements, hiring waves and the booking window) reshapes what visiting Ras Al Khaimah will look like from that autumn onwards.

We will keep this guide updated as each milestone lands. If you want the detail on a specific topic (dining, rooms and pricing, jobs, gaming rules, the bridge, the Enclave and its Townhomes, the Chef’s Table partnership or how Wynn stacks up against other UAE luxury resorts), each of those guides is linked throughout this article.

Booking.com

Related questions

Abhishek Tiwari

I'm Abhishek Tiwari. I'm critical. I'm detail-oriented. I'm neat. I'm technical. I'm creative. I'm an out-of-the-box thinker. I'm dedicated. I'm emotional. I'm communicator. I'm crisp. I'm dramatic. I'm above the line. I'm below the line. I'm spender. I'm digital. I'm strategist. I'm revolutionary. I'm a marketer. Inside and out.

More stories by Abhishek